Skip to content
Faisal Hills

What has actually been built.

Dated notes from the ground, not a developer's progress bar. Filter by roads, utilities, possession, amenities or balloting.

Executive Block

Possession delivered
Completion90%

Block A

Partial possession
Completion88%

Prime Block

Under development
Completion28%

Block B

Partial possession
Completion72%

Block C

Partial possession
Completion64%

Block D

Possession delivered
Completion82%
  1. Roads17 Aug 2026Block C

    Block C internal lane carpeting extended

    Carpeting completed across the majority of Block C internal lanes. Outer streets remain scheduled, with kerb work running ahead of the asphalt crew.

    Progress on this workstream82%
  2. Utilities28 Jul 2026Block D

    Block D sewerage laid on spine roads

    Main sewerage lines are laid along both spine roads in Block D. Lane-level connections continue in sequence from the block entrance inward.

    Progress on this workstream58%
  3. Utilities10 Jul 2026Executive Block

    Executive Block street lighting energised

    All Executive Block streets are now on the society lighting circuit, completing the last outstanding item for the block.

    Progress on this workstream100%
  4. Roads21 Jun 2026Prime Block

    Prime Block northern spine under construction

    Formation and sub-base work started on the Prime Block northern spine. This is the milestone that typically precedes lane-level development in a new release.

    Progress on this workstream28%
  5. Amenities29 May 2026Block B

    Central park irrigation upgraded in Block B

    The Block B central park irrigation network has been replaced, with new planting along the walking track and additional seating installed.

    Progress on this workstream96%
  6. Possession15 Apr 2026Executive Block

    Executive Block arcade two handed over

    Possession handed over for the second arcade on the main boulevard inside Executive Block. Ground-floor units are letting; upper floors remain largely vacant.

    Progress on this workstream74%
  7. Roads7 Mar 2026Prime Block

    Prime Block access road connected to the northern spine

    The Prime Block access road now connects to the northern spine, opening site access for development machinery.

    Progress on this workstream34%
  8. Possession26 Jan 2026Block A

    Block A possession in most sectors

    Possession is now available across most Block A sectors. A handful of outer lanes remain on a street-level check before a token — the civic centre and the bulk of the residential grid are handed over.

    Progress on this workstream88%
Talk to the office

A photo from last month is not a substitute for a drive.

If you are buying in a developing block, we will take you to the spine road and the plot. That visit answers more than this page can.